Lessines – Aquatic Centre

Construction of an aquatic centre

The new aquatic centre project in Lessines is part of a desire to provide the city with a modern sports and leisure facility, replacing the former swimming pool, which has been closed since 2018.

The project involves the construction of a multipurpose complex combining sports, recreational and wellness functions. The facility is organised around three distinct pools, complemented by dedicated fitness and wellness spaces, thus responding to a logic of diversified offerings adapted to a wide audience.

Located on the existing site, the project involves the demolition of the current infrastructure and the complete reconstruction of a new complex. The construction work, estimated to last approximately two years, is designed in such a way as to maintain the activity of neighbouring facilities, in particular the sports hall, requiring rigorous organisation of the work phases and access routes.

The project also includes a requalification of the surrounding area, with exterior landscaping aimed at improving accessibility, circulation and the integration of the complex into its urban environment.

From a technical and energy standpoint, the project incorporates measures aimed at optimising the building's performance, notably through the use of renewable energy production systems such as photovoltaic panels and heat pumps, in a logic of increased energy self-sufficiency.

From a programmatic point of view, the aquatic centre is positioned as a structuring facility for the city, combining sports activities, swimming lessons and leisure offerings, while addressing contemporary challenges of sustainability and operational cost management.

Carried by the City of Lessines and its municipal authority, the project represents a significant investment, with an opening envisaged for 2027.

Project characteristics:

  • Location : Lessines

  • Year of construction : 2024

  • Project cost : €18,098,800€

  • Project Owner : Autonomous Municipal Sports Authority of Lessines

  • Architect : Arcadus

  • Partner : Dherte – Tradeco

Découvrez nos projets similaires

Do you have a project?

Contact us
dherte-flobecq.jpg