Walibi - Extension of the aquatic area
As part of a project carried out for the park, we built an aquatic area specially designed for the youngest visitors. With a depth of approximately 30 cm, this space guarantees optimal safety while offering a fun and refreshing setting.
The installation relies on a complete technical system, concealed beneath the building, which we set up to ensure the supply, filtration and water treatment for the entire aquatic facility.
The pool is equipped with several slides and water games, designed to stimulate children's imagination while offering them hours of fun in complete safety.
Project characteristics:
- Location: Wavre
- Construction duration: 2017-2018
- Project cost: €2,221,546.35
- Project Owner: BELPARK S.A.
- Architect: ABR Architects