A look back in pictures at the L’Arbre Vert school project in Mons

The Mons Arbre Vert project includes:

  • 10 new classrooms

  • 1 physiotherapy room + 2 snoezelen rooms

  • A kitchen with a dining hall

  • A pavilion-style layout designed to blend into a green site in the heart of the city

The new wing was built while the old building remained in operation, a real logistical challenge met with precision by our teams on site.

  • Architect: Atelier 4D Architectes SRL

  • Project Owner: SPABSH

  • Engineering firm: CSD Ingénieurs – ERM Project

Do you have a project?

Contact us
dherte-flobecq.jpg